PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Continued the underground electrical roughing at the Electrical Room 186 Facing North.jpg Installed conduit inside the detention doors Facing West.jpg Installed rebar along the block layout at the 1st floor cells Facing North.jpg Installed waste piping at the 1st floor going into the 2nd floor Kitchen 213.jpg Installing sanitary-waster piping at the 1st floor going into the 2nd floor bathroom 208 Facing North.jpg Sanitary-waste piping going into the 2nd floor bathroom 234 Facing North.jpg
Previous pageNext page Installed conduit inside the detention doors Facing West
Installed conduit inside the detention doors Facing West